Construction period: December 2007 to September 2009.
Krasnogorsk Area located in the central part of Moscow Region has a strong industrial potential. Both freight and passengers are mostly carried by auto transport. As a whole, the auto transport system of the southern Krasnogorsk Area used to be underdeveloped and overloaded. Construction of the traffic interchange at 27th km by Russian-German Joint Venture Autobahn Ltd helped solve this problem in general by unclogging Rublevsko-Uspenskoye Highway and providing free exit from the adjoining sites of Vega Line LLC, Metra Real Estate LLC, Oriflame Products LLC and other companies.
Before starting the interchange construction, the company relaid underground cable lines of several operators, high voltage lines, gas mains and other utilities.
As it carried out construction work, Autobahn widened the existing overpass, built four new interchange ramps, widened Glukhovo – Nikolo - Uryupino road and a section of M-9 Baltiya highway about 4.5 km long and provided interchange lighting and electric power supply.



