Construction and installation work was completed in 2005.
When placed in service, the relief road around Nepetsino enabled:
- traffic to be kept out of Nepetsino, Andreevka, Sanino and Nastasino;
- ecological conditions in the above localities to be improved;
The total length of the road constructed is 14.5 km; the total traffic interchange length is 3.4 km.
The project involved about 1,000,000 m3 of earthwork, 400,000 m2 of pavement, construction of eight bridges and overpasses, a double-track railway bypass 1.5 km long with an overpass, a noise barrier and treatment facilities close to the bridge over the river Severka.